Molly Marshall | 2026-09-28
Source: City of Spokane, Assembled PlanSpokane Comments (October 2 packet).
Packet record C047-P466 | PDF pages 271, 272, 273, 274, 275, 276.
Reviewed reading copy. Personal contact details are omitted.

Subject as filed: PlanSpokane 2046 Public Comments

[Source PDF page 271]

I have attached my comments addressing concurrency and capital facilities
Capital Facilities and Concurrency Plan Spokane comments
Please keep strong and measurable concurrency requirements in PlanSpokane 2046.
The current Comprehensive Plan gives the public a clear understanding of what concurrency means. It says that adequate facilities must be available when development needs them, identifies the services covered, provides a six-year financial commitment standard, requires ongoing evaluation of capacity, and says development cannot be approved when it would push service levels below adopted standards.
The proposed plan removes the current “Available Public Facilities” policy and replaces the “Concurrency Management System” with a much broader “Capacity Monitoring” policy. The City's own materials say this language is being broadened to provide more flexibility.
Monitoring capacity is important, but monitoring by itself does not tell the public what happens when capacity is inadequate.
We are asking the City to keep clear, measurable rules: identify the facilities covered, establish minimum service levels, calculate available and committed capacity, require real financial commitments for needed improvements, and clearly state that development cannot be approved when it would cause adopted minimum service standards to be exceeded unless adequate improvements or other legally sufficient measures are concurrent with the development.
Growth and infrastructure should be planned together. Please do not replace enforceable concurrency requirements with vague language about monitoring, coordinating, and prioritizing.
Please keep clear and enforceable concurrency requirements in the new Comprehensive Plan
The proposed PlanSpokane 2046 Capital Facilities chapter still uses the word “concurrency,” but it removes or weakens several of the rules that currently explain what concurrency means and how it is supposed to work.
New development should not be approved if the public facilities needed to serve it are not available, or if approving the development would push those services below the City's adopted minimum standards.
Facilities such as roads, water, sewer, stormwater, fire protection, police, parks, libraries, schools, and other public services.People should be able to understand the basic rule: If we approve more growth, the City needs to make sure there is enough infrastructure and public-service capacity to serve that growth. The current Comprehensive Plan contains much more specific protections than the proposed update.

[Source PDF page 272]

1. The current plan clearly says when facilities have to be available
The current policy, CFU 2.1 – Available Public Facilities, says that concurrency is met when:
● water, wastewater, and solid waste facilities are available when development is ready for occupancy and use; and
● for other public services, there must be a financial commitment at the time development is approved to provide the services within six years.
The current plan also says that adequate facilities and services must be shown to be available before new development can be approved. The City is removing CFU 2.1 altogether and in its own review document says:
“CFU 2.1 removed, this is a requirement of concurrency.”
The problem is that removing a policy because it is considered part of “concurrency” does not tell the public where the specific requirements went. The new plan should not make residents search through future regulations, administrative procedures, or individual department policies to find out what the City's concurrency rules actually are. A clear rule such as “a financial commitment must be in place within six years” is something that can be checked. A general statement that development must be “concurrent” is much less clear unless the plan also explains exactly how concurrency will be measured.
2. “Concurrency Management System” is
being changed to “Capacity Monitoring”
The current plan says:
CFU 2.2 – Concurrency Management System
Maintain a concurrency management system for all capital facilities. The current plan explains what that system is supposed to do and identifies facilities that must meet adopted service standards, including:
● fire protection
● police
● parks and recreation
● libraries
● sewer and stormwater
● water
● solid waste

[Source PDF page 273]

● transportation
● schools
It also calls for regular evaluation of service levels and growth trends so the City can identify needed improvements and incorporate them into capital improvement plans and budgets.
Most importantly, the existing framework says the City must ensure adequate facilities are available or prohibit development approval when the development would cause service levels to fall below established standards.
The draft replaces CFU 2.2 with:
CF-1.5 – Capacity Monitoring
“Maintain a system or program for monitoring, allocating, and reserving public facilities and service capacity to meet concurrency requirements.”
The City's own review materials say CFU 2.2 is being rewritten as CF-1.5, “Capacity Monitoring,” and describe the language as being broadened to provide more flexibility.
Monitoring capacity is not the same thing as requiring adequate capacity.
A monitoring system can tell us that a fire station is over capacity, that a sewer system is approaching its limit, or that parks are falling below a service standard. The plan should clearly say: If a proposed development would cause an adopted minimum service level to be exceeded, the development cannot be approved unless the necessary improvements, funding, or other legally acceptable measures are in place. Without that second part, “monitoring” could become simply a reporting exercise.
3. The draft removes the clearest
statement about what happens when there
isn't enough capacity
The current plan says that the City must ensure adequate facilities are available to support development or prohibit development approval when the development would cause service levels to fall below established standards.
The proposed chapter does not contain an equivalent, equally clear statement.

[Source PDF page 274]

If a development does not have enough available public-facility capacity, is the City required to deny or defer the development, require improvements, or obtain a firm financial commitment? The new plan should answer that question directly.
4. The current plan has a six-year financial
commitment rule
The current plan provides a specific alternative when a facility is not already available.
Spokane's existing municipal code already contains a similar six-year concept for transportation concurrency and identifies examples of financial commitments, including approved public funding, federal/state funding, secured developer commitments, and other assured funding.
The Comprehensive Plan should retain a clear definition of what counts as a financial commitment and should not leave this entirely to future administrative interpretation. A financial commitment means something more concrete.
5. The proposed plan uses more flexible
words
There is an important difference between words such as:“shall,” “must,” and “prohibit” and words such as:“should,” “monitor,” “coordinate,” “prioritize,” and “encourage.”
The current plan contains several requirements that tell the City what it must do. The proposed plan uses more general planning language in several places. For example, the current CFU 2.3 policy says the City will:
“Develop and implement a phasing schedule”for providing services.
The proposed replacement, CF-1.7, uses language about capital facilities being “strategically coordinated” with land-use and development trends and prioritized where more intensive land use is anticipated. We should be able to distinguish between a goal: “We should plan for infrastructure.” and a requirement: “We will not approve growth that exceeds the infrastructure capacity we have committed to provide.”

[Source PDF page 275]

6. Spokane already has a concurrency
system
Spokane's existing municipal code says development applications are subject to concurrency review, subject to specified exemptions. The review is conducted by the appropriate facility and service providers.
The City's code also defines concurrency in terms of facilities being available when development impacts occur or having the necessary financial commitments to complete the facilities within six years.
Does the new Comprehensive Plan preserve the clear standards that the City's existing concurrency system is supposed to use? The updated plan should make that answer unmistakably yes.
7. Washington's rules also emphasize an
objective standard
Washington's Growth Management Act rules say that transportation is the facility for which concurrency is mandatory, but cities may adopt concurrency for other facilities as well.
For capital facilities necessary for development, Washington's rules also call for a minimum level-of-service standard or another objective basis for determining when additional facilities or capacity are needed.
The baseline is supposed to identify the level below which the jurisdiction will not allow service to fall, with periodic analysis to determine whether the standard is being met.
That makes clear standards especially important.The concern is not that Spokane cannot change its system.The concern is that the new plan should not replace objective standards with vague promises to monitor and coordinate.
I support responsible growth and good planning. I am not asking the City to stop growth. I am asking the City to make sure that growth and infrastructure remain connected.
The Comprehensive Plan should clearly tell residents what level of public services the City promises to maintain, how much capacity is available, how new development will be evaluated, and what happens when there is not enough capacity.

[Source PDF page 276]

Please do not replace specific concurrency requirements with broad language about monitoring, coordinating, allocating, and prioritizing. Keep objective standards, measurable capacity requirements, financial commitments, and a clear consequence when development would exceed available capacity.
Growth should pay attention to infrastructure capacity, and infrastructure planning should keep pace with growth. That is what meaningful concurrency means.