Dr. Elizabeth O'Halloran

Dr. Elizabeth O'Halloran | 2026-06-17
Source: City of Spokane, Assembled PlanSpokane Comments (October 2 packet).
Packet record C259-P297 | PDF pages 1087, 1088.
Reviewed reading copy. Personal contact details are omitted.

Subject as filed: City planning code comment

[Source PDF page 1087]

Request for Spokane City Code Amendment - Data Center Aquifer Protection
and Zoning Restrictions
Dear Spokane City Council and Planning Staff
As a Spokane resident, I am writing to formally request that the City proactively protect our drinking water supply by updating our land use and zoning regulations regarding commercial data centers. Kootenai County recently enacted strict updates to its land use code to explicitly prohibit data centers from being built over the shared Spokane Valley-Rathdrum Prairie (SVRP) Aquifer. Because water systems do not recognize county or state lines, Spokane is now highly vulnerable to developers looking to bypass Kootenai’s protections.
To address this regional loophole, here is a draft code amendment modeled after successful regional frameworks. I request that the Planning Commission review this language for inclusion in the city's 20-year planning. I ask that you also urge Spokane County to adopt this.
SECTION 14.618.240 – PROHIBITED USES AND ACTIVITIES
(A) Data Center Prohibition Within Critical Aquifer Recharge Areas.
No building permit, conditional use permit, site development permit, land use approval, or other authorization shall be issued for any data center, hyperscale data center, enterprise data center, artificial intelligence computing facility, cryptocurrency mining facility, server farm, or substantially similar high-density computing use within any designated Critical Aquifer Recharge Area (CARA), High Vulnerability Aquifer Area, or
directly over the mapped Spokane Valley-Rathdrum Prairie (SVRP) Aquifer.
This prohibition shall apply regardless of cooling method, water source, wastewater management system, ownership structure, or electrical demand.
SECTION 14.802.140 – DATA CENTERS
(A) Permitted Locations.
Data centers shall be prohibited in all zoning districts except Heavy Industrial (HI) districts.
(B) Minimum Separation Requirements.
No data center shall be located within:
1. Two (2) miles of any residential zoning district
2. Two (2) miles of any school, daycare, hospital, nursing facility, public park, or recreation area;3. Two (2) miles of any incorporated city boundary

[Source PDF page 1088]

4. Five (5) miles of any designated Critical Aquifer Recharge Area. (C) Electrical Demand Threshold.
Any proposed facility requiring greater than ten (10) megawatts of electrical capacity shall be prohibited.
(D) Water Use Restrictions.
The facility shall demonstrate zero groundwater withdrawal, zero aquifer recharge impacts, and zero industrial wastewater discharge associated with cooling operations. (E) Backup Generation.
The installation or operation of diesel-fueled backup generation exceeding a cumulative capacity of five (5) megawatts is prohibited.
(F) Public Interest Finding.
(G) Existing Structures/Operational Facilities such as colocation facilities and traditional data centers are exempt from this and are grandfathered in. This is for any proposed large load artificial intelligence data facility that is seeking to build in Spokane County.
The Board of County Commissioners shall not approve a data center unless it finds, based upon substantial evidence in the record, that the facility will provide a direct and measurable public benefit to Spokane County that outweighs all identified environmental, infrastructure, utility ratepayer, land-use compatibility, noise, traffic, and groundwater risks.
Failure to make such a finding shall require denial of the application.
Thank you for your time, leadership, and continued dedication to protecting Spokane County’s vital natural resources. Given the recent public discussion around potential data center development and the SVRP Aquifer, I would also ask to be placed on any future notification list for Comprehensive Plan, zoning, CARA, or development code amendments related to data centers and aquifer protection.
Sincerely
Dr. E. O'Halloran